Cross crane, site crane in assembly scaffold
Project | “ARGE ABD Zürich” |
Rail profile | HEB 300 |
Power supply | 3 phases busbar + PE |
1 Hoist | für 1,6 t lifting capacity |
Travel speed of the hoist | max. 16 m/min |
Centring in central position | mechanical positive locking |
Control | via radio system |
Installed power | ca. 2 kW |
Empty weight | ca. 1.400 kg |
Max. working weight | ca. 3.000 kg |
Construction site crane under the station ceiling
Project “Düsseldorf underground railway”, stations GAP + Kirchplatz + Schadowstraße
Rail profile I 140E
Power supply 3 phases busbar + PE
Largest gradient 0 to 10
Length of the route 30 to 100 m
2 electric friction wheel drives, modularly expandable
2 hoists for 2.5 t lifting capacity each = 5.0 t
Travel speed of the crane max. 50 m/min
Parking brake via brake motors
Control via radio system
Installed power up to approx. 25 kW
Empty weight approx. 1,200 kg
Max. working weight 6.200 kg
Construction site crane under the station ceiling
Project “Düsseldorf underground railway”, GAP station
Rail profile I 140E
Power supply 3 phases busbar + PE
Largest gradient 0 to 20
Length of the route 250 m
3 electric friction wheel drives, modularly expandable
2 hoists for 2.5 t lifting capacity each = 5.0 t
Travel speed of the crane max. 50 m/min
Parking brake via brake motors
Control via radio system
Installed power up to approx. 40 kW
Empty weight approx. 2000 kg
Max. working weight 7.000 kg
Construction site crane under the station ceiling
Project “Düsseldorf underground railway”, BILK station
Rail profile I 140E
Power supply 3 phases busbar + PE
Largest gradient 0 degree
Length of the route 50 m
1 electric friction wheel drive, modular expandable
2 hoists for 3.2 t lifting capacity each = 6.4 t
Travel speed of the crane max. 50 m/min
Parking brake via brake motors
Control via radio system
Installed power up to approx. 20 kW
Empty weight approx. 1,300 kg
Max. working weight 6.300 kg
Main crane, site crane in assembly frame
Project | “ARGE ABD Zürich” |
Rail profile | HEB 500 mit untergeschweißter Zahnstange |
Power supply | 3 phases busbar + PE |
Largest gradient | 4% |
1 Hebezeug | for 20 t lifting capacity |
1 Hebezeug | for 2.5 t lifting capacity |
Travel speed of the crane | max. 60 m/min |
Electrical gear drive | frequency controlled |
Parking brake | via brake motors |
Control | via radio system |
Installed Power | appr. 15 kW |
Empty weight | appr. 3.000 kg |
Max. Working weight | 23.000 kg |